Corrosion Control Engineer Blog

Friday, October 11, 2013

Inspection of Pipeline CP Systems with ILI Tools

 
Found this interesting presentation on the internet at the following weblink.
 
http://ppsa-online.com/papers/07-presentations/CDbakerHughes.pdf

 
Posted by Ron Hodgman at 9:38 PM No comments:
Labels: Cathodic Protection, CIS, close interval survey, CP, ILI, Pipeline Integrity, Pipelines, smart pig

SPA - October 16, 2013 Presentation


Posted by Ron Hodgman at 3:02 PM No comments:
Labels: Cathodic Protection, Corrosion Control, natural gas, Pipelines, production, SPA, tanks, well casings
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Blog Archive

  • ►  2014 (22)
    • ►  May (6)
    • ►  April (6)
    • ►  March (8)
    • ►  January (2)
  • ▼  2013 (13)
    • ▼  October (2)
      • Inspection of Pipeline CP Systems with ILI Tools
      • SPA - October 16, 2013 Presentation
    • ►  May (1)
    • ►  March (1)
    • ►  February (2)
    • ►  January (7)
  • ►  2012 (12)
    • ►  December (3)
    • ►  November (8)
    • ►  April (1)
  • ►  2011 (1)
    • ►  April (1)
  • ►  2010 (7)
    • ►  May (1)
    • ►  April (6)
  • ►  2009 (3)
    • ►  May (3)

Corrosion Control Links

  • Cath-Tech
  • Corrosion Jobs
  • Corrosion-Club.com
  • DCVG.COM
  • DCVG.ORG
  • EDI (ElectroChemical Devices, Inc.)
  • Farwest Corrosion
  • M. C. Miller Company
  • Mears Group
  • Mesa Products
  • NACE International
  • Pipe Camp - DCVG Meter
  • Schiff Associates
  • Southern Cathodic Protection

Search This Blog

My Blog List

  • Korosi Pipa, Metode Pemeriksaan Korosi Pipa & Tulisan tentang Pipeline dan Korosi.
    XCJ] Gratis download: Black Moon (2011) Volledige film met Dutch HD-ondertitels Bluray Online
    7 years ago
  • Marketing: DCVG Surveyor
    LEO Vertical Axis Wind Turbines
    14 years ago
  • Integrity Engineering
    Stress Corrosion Cracking – Two Cases in a Row
    16 years ago
Awesome Inc. theme. Powered by Blogger.